333 Water – Third Ward High-Rise Apartment Tower


The planned riverfront development, replacing an underutilized parking lot, includes the construction of a groundbreaking 32-story luxury apartment tower in the heart of the Historic Third Ward neighborhood. The building design incorporates an innovative use of outdoor space to provide outdoor seating for a ground floor restaurant and redesigned access to the RiverWalk. Located across from the Public Market, the 295 residential units housed within the building will bring a new tax base to the neighborhood, and the lower-level commercial spaces offer new opportunities for economic development. Giles is proud to provide planning, design, geotechnical, environmental, and construction materials testing services to support the 333 Water project.

Geotechnical Engineering

Based on Giles’ extensive knowledge/experience of the third ward and riverfront properties, we were able to provide crucial information directly impacting the design process alongside an economical proposal. Giles performed a thorough geotechnical site evaluation and executed over a dozen soil borings ranging between 50 and 150 feet below-ground using company owned and operated hollow-stem-auger and direct-push sampling equipment. Due to the proximity to the Milwaukee River, a comprehensive foundation dock wall analysis was also performed to maintain stability along the waterfront. The conclusions of this investigation were provided to the client in an engineering geotechnical report that included multiple foundation recommendations to provide the client with a range of options and prices.

Environmental Services

The comprehensive approach to the Phase II ESA resulted in a streamlined Site Investigation and preparation of a Historic Fill Site Exemption. Giles completed a Phase II ESA to evaluate the conditions of soil and groundwater beneath the site in advance of redevelopment activities. Giles was able to successfully delineate the extent of fill material on the property, as well as an area of impacted soil containing levels of lead exceeding regulatory standards. Giles also collected and analyzed groundwater samples from the existing on-site groundwater monitoring well network. The new development will continue to be protective of the environment by restricting access to the underlying impacted fill material that is present beneath the property and the Third Ward.

Construction Materials Testing

Giles Construction Materials Testing team is proud to have been on the project full time since before ground break to the last concrete pour. For approximately 1 year, Giles provided services such as pile driving observations, vibration monitoring, crack monitoring of surrounding buildings, rebar placement observations, soil observations, observation of placement and recording elongations of post-tensioned steel, and testing concrete.

At a Glance

Location: 333 North Water Street
Milwaukee, Wisconsin
Client: Hine Aquations, LLC