Nova Apartments

Nova Apartments


The Nova Apartment development, currently under construction on Milwaukee’s Lower East Side, has transformed stagnant real estate into a desirable eight-story building featuring 251 rental units, ground floor commercial, and retail space. Giles played a crucial role in assessing and addressing geotechnical and environmental challenges to facilitate the transformation of the site into a vibrant residential and commercial space.

Geotechnical Services

Giles conducted a comprehensive geotechnical investigation which highlighted economical foundation recommendations for the proposed apartment structure and analyzed potential settlement impacts on neighboring buildings. Giles was able to immediately complete both exterior and interior soil borings within buildings present at the time using company-owned and operated drill rigs. This streamlined results and eliminated the need for interior soil borings following the razing of the structure.

Environmental Services

At the time of our Phase I ESA, the site was occupied by a public pay parking lot and a vacant, two-story building previously occupied by Buca di Beppo restaurant and Bally Total Fitness. Prior to construction of the building in 1978, the site had been occupied by several residences, as well as a funeral home, a school of mortuary science, a tavern, an antique store, and a dry cleaner. The former dry cleaner was identified as a recognized environmental condition, as were several off-site former dry cleaners. The potential for abandoned fuel oil underground storage tanks (USTs) associated with the former dwellings was also identified as a recognized environmental condition.
Giles conducted a magnetometer survey to identify locations of potential USTs on the property. Test trenches of areas flagged during the magnetometer survey uncovered two USTs. Giles provided excavation oversight as well as documentation of the removal of both USTs from the property as well as a thorough Tank System Site Assessment (TSSA) for each tank.

Giles initiated a Phase II ESA collecting and analyzing multiple soil and deep soil gas samples around the perimeter of the property to evaluate potential off-site sources of contamination. The presence of contaminated fill material on the property provided a challenge for redevelopment; However, Giles familiarity with historic fill material expedited sampling location plans and lab results. Results of the Phase II ESA determined the design of the proposed apartment structure as well as soil disposal arrangements. Giles worked closely with developers and the regulatory entities to implement an efficient soil disposal plan for fill material and native clean soil. By diverting the native material from traditional landfills, the material could be beneficially reused at a reduced cost to the client.

Construction Materials Testing

Giles provided construction materials testing services on this project such as soil strength testing, concrete testing, and rebar observations.

At a Glance

Location: 1137 N. Van Buren Street
Milwaukee, Wisconsin
Client: New Land Enterprises, LLC