Sheffield Elementary School Renovation

Sheffield Elementary School Reconstruction


Professional Services contract to provide Geotechnical Engineering, Construction Materials Testing for the new two-level elementary school. The elementary school covers approximately 1,000.00 square feet with paved parking areas and drives, as well as turf fields.

Geotechnical Engineering

Geotechnical Engineering services were performed by Giles, and it involved a subsurface evaluation of the site while the previous structure was still standing. The evaluation included 20 borings up to 45 feet from the existing ground surface. Based on this investigation, Giles provided a geotechnical report that recommended multiple foundation and floor slab options, as well as Pavement and Design/Construction Considerations based on the testing and observations of the onsite soils and existing structure.

Construction Materials Testing

Giles Construction Materials Testing team is proud to have been on the project full time since before ground break to the last concrete pour. For approximately 2 years, Giles provided services such as straight shaft pier testing and observations. lime gradations, reinforcing steel placement observations, soil observations, concrete placement observations and testing, fireproofing observations, and structural steel inspection. Additionally, Giles’ CMT department provided 311T testing and observations, a service that helps clients meet the paving and drainage requirements of the City of Dallas in a more efficient and timely manner.

At a Glance

Location: 18111 Kelly Blvd
Dallas, Texas
Client: Carrollton-Farmers Branch Independent School District

How Can We Be of Service?

Our engineering philosophy of “Make it Happen” is to provide all clients with innovative, economical and practical solutions to their engineering needs. Contact Giles Today.

    Social media & sharing icons powered by UltimatelySocial