The Couture

The Couture


The Couture development is a 44-story luxury apartment building currently under construction along the lakefront in downtown Milwaukee. Once completed, the skyscraper will be the tallest residential tower in the State of Wisconsin. The building will include over 300 apartments, 45,000 square feet of commercial space, and a multimodal transit hub, which includes a concourse for The Hop streetcar, to connect the lakefront with the heart of the city. Giles worked closely with Barrett Lo Visionary Development (the Developer) to secure grant funding for site investigation (SAG monies) as well as redevelopment (Brownfield Grant).

Giles’ extensive experience on complex redevelopment projects throughout Milwaukee allows Giles to anticipate the unique geotechnical and environmental challenges that arise when developing along Milwaukee’s lakefront. Giles has been involved with The Couture project during multiple stages of development, providing pre-construction, geotechnical, environmental services, and continues to provide construction materials testing services during the construction phase.

Geotechnical Engineering

Giles performed geotechnical exploration and engineering analysis, including nine geotechnical test borings and pressure meter testing for shallow foundation design. Giles assisted in the design of the below-grade dewatering system for the structure. Based on the Geotechnical investigation, high-capacity piles (400-ton allowable axial capacity) were designed to support the Couture Tower, and shallow foundations were designed to support the surrounding transit hub.

Environmental Services

Giles completed a Phase I ESA on the former MCTC parking garage and bus marshaling depot. Our research determined that several railroad tracks serving the Chicago & Northwestern Railroad depot were present on the site from the 1800s until the early 1960s. Giles was also able to determine that the property had once been part of the ancestral Lake Michigan shoreline and was infilled in the late 1800’s during the City-wide redevelopment plan to create buildable landmass. Based on Giles’ extensive and thorough historical research, the Phase I ESA identified the potential for fill material on the site as a recognized environmental condition.

Giles’ environmental division conducted a Phase II ESA to investigate the environmental condition beneath the property. This assessment consisted of collecting over thirty soil samples to characterize the fill material/native soil throughout the site as well as collecting groundwater samples from groundwater monitoring wells throughout the site. Giles’ environmental investigation identified and delineated two types of impacted historic fill material beneath the property and an accurate conceptual site model was prepared. Giles worked closely with the developers, earth work contractors, state regulators, and the City of Milwaukee to implement a soil disposal solution that involved segregating the fill material for disposal as Low-Hazard Exempt material. This resulted in the cost-effective reuse of excavated materials and diverted thousands of tons of soil from traditional landfills.

Construction Materials Testing

Giles has been on this project full time for the last two years providing services such as vibration monitoring, observation of installation of piles and sheeting, soil testing, soil removal observations, density testing, observation of rebar, observation of placement and recording elongations of post-tensioned steel, and testing concrete.

At a Glance

Location: 909 E. Michigan Street
Milwaukee, Wisconsin
Client: The Couture

How Can We Be of Service?

Our engineering philosophy of “Make it Happen” is to provide all clients with innovative, economical and practical solutions to their engineering needs. Contact Giles Today.